THERMAL DISPLACEMENT VENTILATION (DV) IN SCHOOLS




The table below lists Project 2deliverables by task number. When a deliverable is complete, a link will be provided for accessing it.
-
-
Project 2: Thermal Displacement Ventilation (DV) in Schools
-
Task 2.0 - Administration
D2.0E Final Report

Task 2.1 - Coordination with On-going Related PIER Natural Ventilation and DV Research
D2.1A TDV Research and Literature Summary Report

D2.1B Final Coordination Report
-
Task 2.2 - CFD Analysis of Thermal Comfort and Ventilation Effectiveness
D2.2B Classroom Prototypes Developed Report

D2.2D Final CFD Analysis & Documentation Report
-
Task 2.3 - CFD Validation with Full-Scale Mockup
D2.3B Final Mockup Test Plan
D2.3D
Final Barriers Study Report
-
Task 2.4 - Barriers Study
D2.4B Final Preparation for Focus Groups or Interviews Report

D2.4D Final Barriers Study Report
-
Task 2.5 - System Design Options
D2.5C Final Outline Specification and Schematic Design Report
D2.5E Final Research Report
-
Task 2.6 - Construct Demonstration Classroom
D2.6B Final Research Report
D2.6D Commissioning Plan - Dry Creek
D2.6D2 Commissioning Plan - Capistrano
D2.6E Commissioning Report
-
Task 2.7 - Monitor Performance of Demonstration Classrooms
D2.7B Final Test Plan - Dry Creek
D2.7B2 Final Test Plan - Capistrano
D2.7D Final Classroom Documentation Report
-
Task 2.8 - Product Development
D2.8B Final Equipment List and Performance Specification Report
D2.8D Final Product Engineering Efforts Report
D2.8G Final Research Summary Report
-
Task 2.9 - Fact Sheets and Guidelines
D2.9C Final Promotional Materials and Documents (Design Guide - Corrected and Reposted January 22, 2007)
-
Task 2.10 - Information Dissemination
D2.10B Final Curriculum and Materials
__LAUSD Design Charette
__ASHRAE Winter 2006 Meeting Presentation
__CASH Conference
__ACEEE Paper
__Engineered Systems Article
D2.10D Final Evaluation Report
-
Task 2.12 - Production Readiness Plan
D2.12B Final Production Readiness Plan