The following reports are available.
- Performance Verification Report - FERRO undertook an extensive development program to develop a new, custom plastic that achieved over 97 percent reflectivity and that was easy to injection mold. This report presents the evaluation of this material as a
component of a new classroom light fixture.
- Design Templates - This document provides the templates for the three integrated lighting systems (good, better, and best) for classrooms.
- Finelite Press Release - Dated August 2003, the first press release for this project.
- Integrated Classroom Lighting Presentation - This power point details the different installations, benefits and costs, and initial feedback from the test sites.
- School Sites - A list of the 19 sites that have been installed with the lighting systems.
- ICLS Case Study - the document highlights the results of the ICLS at Heritage Oaks School.
- ICLS Performance Specification - For Section 16500, this document provides the specification for an energy efficient lighting system based on the ICLS.
- Project Final Report - Over 180 pages of project findings, manufacturer literature, and test site results.
- Appendices for Project Final Report - zip file.
|
|
Project
Information for the Integrated Classroom Lighting
System
|
The energy monitoring data from the 2003/04 school year is available for the 25 California classrooms monitored at the six schools under this project. 19 of the classrooms had variations of the ICLS installed and 6 of the classrooms had typical 2X4 lay-in troffer T-8 lighting. The zip files for five of the schools are posted below and vary from ~8 to 32 MB.

|