| The table below lists Project 4 final deliverables
by task number. When the deliverable is complete,
a link will be provided for accessing the
electronic file in PDF format. |
| - |
| Project 4: Advanced Packaged Rooftop Unit (ARTU) |
| D4.1D Final Project Report |
| - |
Task 4.2 - Technical Advisory Group (TAG)
D4.2B Final List of TAG Members |
| - |
Task 4.3 - Identify Product Features
D4.3C Final
Product Definition Summary Report
D4.3E Final Report on Cost/Benefit Assessment
of the ARTU |
| - |
Task 4.4 - Develop Prototype ARTU
D4.4B ARTU Product Design Specification |
| - |
Task 4.5 - Develop Test Plan
D4.5B Final Economizer Reliability Test Plan
D4.5D Final
ARTU Performance
Test Plan
D4.5F Final Field Test Plan |
| - |
Task 4.6 - Test Prototype Unit in the Laboratory
D4.6A Reliability Test Report
D4.6B Unit Performance Test Report
D4.6C Revised Product Design Specification |
| - |
Task 4.8 - Develop Tools to Reduce Market
Barriers
D4.8A Final ARTU Design Specification
D4.8C Final Economizer Reliability Test Protocol
D4.8E Final Unit Performance Protocol
D4.8G Final Unit Performance Rating Methodology |
| - |
Task 4.9 - Market Connection Support
D4.9B Final Technology Transfer Plan |