© 2004, Architectural Energy Corporation.
All Rights Reserved.

Funded by California Energy Commission's Public Interest Energy Research (PIER) Program
SpeciFlow™ Technology

The table below lists Project 6 final deliverables by task number. When the deliverable is complete a link will be provided for accessing the electronic file.
-
Project 6: Speci-Flow(TM) Technology
-
Task 6.1 - Administration
D6.1D Final Project Report
-
Task 6.2 - Generic Calibration Curve
D6.2B Final Generic Calibration Test Plan
-
Task 6.3 - Correction for Non-Uniform Flow
D6.3B Final NUFC Test Plan
D6.3E Final NUFC Test Results Report
-
Task 6.4 - Engineering for Enhamced Market Adoption
D6.4A I/O Specification
D6.4B Report Summarizing the Design of the New SF-1000 Prototype
-
Task 6.5 - Market Connection
D6.5C Final Technology Transfer Plan
D6.5E Final Production Readiness Plan









Program Administration | Web-Enabled Automatic Diagnostics | AHU and VAV Box Diagnostics| Advanced Packaged Rooftop Unit
Rooftop Unit Diagnostics | SpeciFlow™ Technology | Program Market Connection
Updated October 3, 2006