Case Studies
|
HVAC Operation Outsourcing example for a 250,000 square foot office building
|
Annual HVAC energy costs before ENFORMA® system was used: $452,500
Problems found using ENFORMA® system:
-
40 hp chilled water pump running 24 hrs/day at 100%
-
Leaky chilled water valves
-
Floors conditioned 24 hours per day
Actions taken to improve performance:
-
Chilled water pump scheduled and modulated
-
Chilled water valves repaired
-
Schedules for the air handling equipment adjusted in the EMS
|
|
Office Building Results
Energy savings achieved: $42,045/yr (9.3%)
ENFORMA® system and repair costs: $25,000
Simple payback: 0.6 years
Cost saved over five years: $210,225
Extra profit for contractor: $185,225
|
Performance Guarantee example of the results ENFORMA® provided for a 170,000 square foot department store
|
Annual HVAC energy costs before ENFORMA® system was used: $384,200
Problems found using ENFORMA® system:
-
Display lighting turned on too early
-
Evaporative coolers disconnected
-
Variable speed drives with wide swings in speed
Actions taken to improve performance:
-
Reset lighting schedules
-
Reconnected evaporative coolers and optimized with chiller system
-
DDC loops adjusted with greater dampening
|
|
Department Store Results
Energy savings achieved: $42,500/yr (11.2%)
ENFORMA® system and repair costs: $9,900
Simple payback: .25 years
Costs saved over five years: $212,000
|
|
|
|