These periods are used only for cogeneration. For Chillers/TES you require only two time periods.
The time period schedules are only used to schedule the events for switching over between charging and discharging. The actual period of the day is defined in the TES setup form in the central plant editor.
Is there a way to model a two separate chilled water system in one building?
No, DOE-2.1E does not support multiple chilled water loops.